Boeing Slows Jet Output and Plans Layoffs at Commercial Unit
Boeing's commercial unit will shrink its staff by about 5% as it slows production. Layoff notices are due in December.

Boeing Commercial Airplanes plans to cut its workforce by about 5% through a mix of attrition and involuntary layoffs, division president and CEO Stephanie Pope told employees in an email on Monday, Nov. 9. The cuts follow a decision to slow planned production increases, according to KMUW and the Seattle Times.
Layoff notifications are expected to begin in December, FOX 13 Seattle reported. Boeing has not said how many people will lose their jobs, or how the cut divides between layoffs and attrition.
What Boeing said
KMUW reported that Pope said the new schedules and lower output left the division with too many people, and that factories and suppliers need more time to settle. KMUW puts the division’s workforce at about 50,000 people. Boeing’s 2025 reporting listed 50,494 people in the division and about 182,000 at the company overall, according to FLYING Magazine.
Boeing told FLYING that raising commercial output has taken longer than planned because safety, quality and stability come first. It is matching headcount to the revised plans over the coming months, and affected workers will get outplacement help, layoff benefits and employee assistance.
Who is and is not affected
A separate message to local employees said staff in Wichita, Kansas, and Tulsa, Oklahoma, are not being considered for layoffs, voluntary separation or early retirement, KMUW reported. Boeing employs about 13,000 people in Wichita after acquiring the former Spirit AeroSystems facility in December 2025.
The production problems behind the cut
On the Oct. 27 earnings call, CEO Kelly Ortberg said becoming fully stable at 47 737 MAX aircraft per month would take into 2027. He separated that work from the next increase, to 52 per month. Ortberg said wings were improving but had not held the needed pace for long enough, and he pointed to Wichita fuselages and the Everett assembly line as the other pieces for the next increase.
The financial plan aims for 52 per month in the second half of 2027, Ortberg told investors, provided Everett is certified and producing, wing output is steady and Wichita fuselages are ready.
The Oct. 27 results showed a $697 million commercial operating loss, with higher projected costs for production-rate adjustments and the supply chain among the factors. The division’s backlog was more than 6,300 aircraft. In October, Boeing also said it would miss its 737 MAX delivery target for this year, pointing to problems at its wing manufacturing facility in Renton, Washington, and that it would not raise monthly MAX output until mid-2027. Production of the 787 Dreamliner in South Carolina is also being slowed, FLYING reported.
What it means for employees and suppliers
For employees outside Wichita and Tulsa, the next signal is December, when the layoff notices begin. FLYING noted that Boeing has cut staff before when production slowed, including after the 737 crashes and the grounding that followed, and after the January 2024 loss of a door plug on an Alaska Airlines jet.
Sources: Airways, FLYING Magazine, Yahoo Finance



